Performance specification
- Track renewal with track bed replacement (total renewal length: 1.5 km)
- Replacement of five turnouts
- Moving a buffer stop
- Drainage (total length: 0.7 km)
- Installation of a new level crossing
- Supply of all materials required for track construction
- Disposal of old sleepers and ballast