Performance specification

  • Track renewal with track bed replacement (total renewal length: 1.5 km)
  • Replacement of five turnouts
  • Moving a buffer stop
  • Drainage (total length: 0.7 km)
  • Installation of a new level crossing
  • Supply of all materials required for track construction
  • Disposal of old sleepers and ballast