Performance specification

  • Track renewal at the railways station Twistringen and at the former station Vehrte
  • Renewal of switches at the railways stations Belm, Bohmte and Lembruch

Amongst other things, the improvements included:

  • Superstructure work conventional reconstruction
  • Civil engineering work
  • Cable civil engineering
  • Deep drainage
  • Loading work
  • Ballast cleaning
  • Installation of formation protection layers
  • Tamping, straightening and welding work
  • Construction site logistics