Services
- Exchange of tracks and sleepers (29 km)
- Replacement of sleepers (11 km)
- Refining of ballast (36 km)
- Exchange of crushed rock and track bed ballast
- Renewal of track switch points (15 pcs)
- Renewal of level-crossings (35 pcs.)
- Renewal of passings (7 pcs.)
- Drainage work (10 km)