Performance specification
- Construction of the rail connection for a silo to the existing railway line
- New track construction or reconstruction, including substructure (total reconstruction length: 450 m)
- Installation of two turnouts and one bumper
- Renewal of loading tracks in the building (total conversion length: 30 m)
- Conversion of cable ducts as well as earthworks