Performance specification

  • Construction of the rail connection for a silo to the existing railway line
  • New track construction or reconstruction, including substructure (total reconstruction length: 450 m)
  • Installation of two turnouts and one bumper
  • Renewal of loading tracks in the building (total conversion length: 30 m)
  • Conversion of cable ducts as well as earthworks