Performance specification

  • Earthworks and superstructure work for the new construction of track 023
  • Installation of a provided switch EW 54 – 300 -1:9
  • Partial deconstruction of track 024 with conversion to a stub track
  • Cable civil engineering works for the technical equipment facilities
  • Partial deconstruction of the former street Langer Morgen and new construction of a company driveway
  • Parallel to the construction of the new track, work is being carried out on the construction of the electrical switch heating
  • Reconstruction of a sewer of the Hamburg city drainage system (Hamburger Stadtentwässerung) (crossing 2.615 km)
    Special feature
    • Complete disposal of the dismantled materials