Performance specification
- Earthworks and superstructure work for the new construction of track 023
- Installation of a provided switch EW 54 – 300 -1:9
- Partial deconstruction of track 024 with conversion to a stub track
- Cable civil engineering works for the technical equipment facilities
- Partial deconstruction of the former street Langer Morgen and new construction of a company driveway
- Parallel to the construction of the new track, work is being carried out on the construction of the electrical switch heating
- Reconstruction of a sewer of the Hamburg city drainage system (Hamburger Stadtentwässerung) (crossing 2.615 km)
Special feature
- Complete disposal of the dismantled materials