Performance specification
- New construction of the railway connection Neuhof – Hohe Schaar
- Track superstructure and civil engineering
- Relocation of the formation protection layer
- Railway drainage
- Track deconstruction
- Cable civil engineering
Special aspect
- Load test of the bridge centre with a locomotive and two Res-wagons