Performance specification

  • New construction of the railway connection Neuhof – Hohe Schaar
  • Track superstructure and civil engineering
  • Relocation of the formation protection layer
  • Railway drainage
  • Track deconstruction
  • Cable civil engineering
Special aspect
  • Load test of the bridge centre with a locomotive and two Res-wagons