Performance specification

  • Renewal of 11 tracks and 14 switches
  • Superstructure welding work
  • Track and switch tamping work
  • Cable civil engineering
  • Shunting path work
  • Deconstruction of track and switch grating
  • Levelling and compaction of the subgrade