Services

  • Exchange of tracks and sleepers (29 km)
  • Replacement of sleepers (11 km)
  • Refining of ballast (36 km)
  • Exchange of crushed rock and track bed ballast
  • Renewal of track switch points (15 pcs)
  • Renewal of level-crossings (35 pcs.)
  • Renewal of passings (7 pcs.)
  • Drainage work (10 km)