Performance specification
- Deconstruction of the existing track system on the railway embankment
- New construction of the track systems in connection with the replacement construction of the Peutebahnbrücke
- 266 m of track bed renewal
- Grinding of new rails for the newly installed track systems
- Installation of the formation protection layer
- Willke Track Service as subcontractor for track superstructure welding