Performance specification
Railway station Delmenhorst
- Dismantling a turnout
- Renewal of eight switches (785 m track)
- Connections to the switches
- Plugging and welding of the switch connections
- 845 m of track bed renewal
- Creation of the laying formation level with own crawler excavator
- Installation of transition rails during conversion of the rail type from S 54 to UIC 60
Bookholzberg railway station
- Renewal of three switches (222 m track)
- 222 m of track bed renewal
- Plugging and welding of the switch connections
- Creation of the laying formation level with own crawler excavator