  • Track reconstruction from Barkåker S to Berg (total reconstruction length: 3,560 m)
  • Track reconstruction from Berg to Eckersbergsgate (total reconstruction length: 4,830 m)
  • Track reconstruction from Skotte to Barkåker Nord (total reconstruction length: 2,340 m)
  • Construction of a temporary track from Frodeåsen to the Eckersbergsgate construction switch (total conversion length: 350 m)
  • Track reconstruction in Kjellelia (total reconstruction length: 650 m)
  • Installation of track in concrete pan and crossings (total conversion length: 1,280 m)
  • Switch reconstruction of 2 switches in the loop at the entrance of the tunnel Frodegaten, in the direction of the railway station Tønsberg
  • Disposal of not reused, demolished track material
  • Installation of rail profile UIC60 of approx. 25,000 m
  • Installation of approx. 21,400 concrete sleepers
  • A total of 19,600 m³ upper track beds filled