Performance specification
- Track reconstruction track 1 in Hell (total reconstruction length: 193 m)
- Track reconstruction track 2 in Hell (total reconstruction length 450 m)
- Track reconstruction track 3 in Hell (total reconstruction length 5,715 m)
- Track renewal track 4 in Hell (total reconstruction length 54 m)
- Conversion of 5 switches
- Installation of 11,488 concrete sleepers