Performance specification
- Section 2 – Tubular tunnel from 0,2 + 50 km to 3,0 + 75 km
Track construction work in 2 tubular tunnels (track 1 and 2 each approx. 2,800 m long), including cable duct work, welding work and partial installation of sub-ballast mats.
- Section 3 A) – rectangular tunnel from 3.0 + 74 km to 3.6 + 30 km
Track construction work in a rectangular tunnel system (track 1 and 2, each approx. 780 m long), including a switch system consisting of 2 pieces ABW 49 – 300 – 1 : 9, 2 piece EW 49 – 190 – 1 : 7 and a shaft cross
1 : 2,917, as well as cable duct work and welding work.
- Section 3 B) – rectangular tunnel from 3.6 + 30 km to 4.0 + 14 km (end)
Track construction works in a rectangular tunnel system (track 1 and 2, each approx. 780 m long), including a switch system consisting of 2 pieces ABW 49 -300 – 1 : 9, 2 piece EW 49 – 190 – 1 : 7 and a shaft cross
1 : 2,917, as well as cable duct work and welding work.
Special features
- Tunnel construction site
- Construction site logistics via crane