Performance specification

  • Exchange of ten turnouts
  • Wooden sleepers replaced with concrete sleepers
  • Track renewal with track bed renewal
  • Execution of cable duct, welding, tamping and straightening work
Special features
  • Switches and track renewal areas were partly located on bridges