Performance specification
- Exchange of ten turnouts
- Wooden sleepers replaced with concrete sleepers
- Track renewal with track bed renewal
- Execution of cable duct, welding, tamping and straightening work
Special features
- Switches and track renewal areas were partly located on bridges