Performance specification

Railway station Hellerup
  • Replacement of turnouts
  • Track reconstruction of track 1, of approx. 8,311 km until the end of turnout 108a and from the end of switch 108a to the end of switch 110b
  • Track reconstruction of track 2, of approx. 8,297 km to the end of turnout 108b
Railway station Klampenborg
  • Replacement of turnouts
  • Track reconstruction of track 1, from 13,147 km to 13,165 km and from 13,231 km to the end of switch 04, 13,445 km
  • Track renewal between turnouts 01 and S1
  • Track renewal tracks 2, 3 and 4, from 13,023 km to 13,109 km
Railway station Helsingør
  • Replacement of turnouts
  • Track reconstruction of track 1, from 45,798 km to 46,165 km.
  • Raising of the platform height from 55 cm
  • Track reconstruction of track 2, from 45,784 km to 46,165 km
  • Conversion of the platform along the tracks 2 and 3, to a 55 platform
  • Conversion of track 12, from 45,784 km to 46,165 km
  • Installation of new buffer stops with strengthening rails, in track 1 and 2
In total there were eleven turnouts replaced