Performance specification

Track reconstruction on a steel bridge (total reconstruction length: 1,650 m)
  • Dismantling and disposal of existing fastening and rails
  • Removing rail extensions
  • Installation of new fasteners and rails
  • Installation of new rail extension (2 pieces)
Track renewal on a concrete truss (total renewal length: 700 m)
  • Removal and disposal of rails, sleepers, protective rails and of the track bed
  • Supply and installation of ballast
  • Installation of rails, sleepers and protective rails
  • Installation of new rail extension (4 pieces)
  • Execution of damp insulation and laying of ballast mats
Track renewal on a ballasted track (total renewal length: 220 m)
  • Removal and disposal of rails, sleepers and guard rails
  • Removal and disposal of track boxes
  • Delivery and installation of track boxes for ballasted track
  • Installation of rails, sleepers, fastening and protective rails
  • Installation of single track construction