Performance specification
Track reconstruction on a steel bridge (total reconstruction length: 1,650 m)
- Dismantling and disposal of existing fastening and rails
- Removing rail extensions
- Installation of new fasteners and rails
- Installation of new rail extension (2 pieces)
Track renewal on a concrete truss (total renewal length: 700 m)
- Removal and disposal of rails, sleepers, protective rails and of the track bed
- Supply and installation of ballast
- Installation of rails, sleepers and protective rails
- Installation of new rail extension (4 pieces)
- Execution of damp insulation and laying of ballast mats
Track renewal on a ballasted track (total renewal length: 220 m)
- Removal and disposal of rails, sleepers and guard rails
- Removal and disposal of track boxes
- Delivery and installation of track boxes for ballasted track
- Installation of rails, sleepers, fastening and protective rails
- Installation of single track construction