Performance specification
- Replacement of sleepers and rails on specified sections (total length: 29 km)
- Supply and installation of 60 ton of track ballast
- Exchange of ballast and sub-ballast (total length: 4 km)
- Disposal of recovered track construction material (sleepers, rails, other steel parts)
- Disposal of extracted gravel, crushed stone, gravel and raw earth material, incl. abstraction of necessary samples and incl. all necessary services and charges
- Track and switch adjustment
- 36 km of track bed cleaning
- 15 turnouts were renewed
- 35 level crossings and 7 other level crossings were renewed