Performance specification

  • Replacement of sleepers and rails on specified sections (total length: 29 km)
  • Supply and installation of 60 ton of track ballast
  • Exchange of ballast and sub-ballast (total length: 4 km)
  • Disposal of recovered track construction material (sleepers, rails, other steel parts)
  • Disposal of extracted gravel, crushed stone, gravel and raw earth material, incl. abstraction of necessary samples and incl. all necessary services and charges
  • Track and switch adjustment
  • 36 km of track bed cleaning
  • 15 turnouts were renewed
  • 35 level crossings and 7 other level crossings were renewed